Showing posts with label master closet. Show all posts
Showing posts with label master closet. Show all posts

Sunday, December 5, 2010

Day One Part 2

These are the photos to show progress made in day 1...A LOT was done! I just keep in mind the saying, "It's got to get worse before it gets better" and that it did!

I laid the carpet tiles in the craft room/office which is now Jack's (our one year old son's) play space on "clean project" days...days without dust, fumes etc.

Entry linoleum removed (Cathy did this...she's a machine!)

Good bye popcorn ceilings!

Good bye bathroom walls...here's the master bathroom. We removed both large windows and re framed the hall bath completely!

Removed the closet wall and vanity to make one large walk-in closet space.


No more popcorn in the master :) I have to admit, removing it was actually fun, yeah...I'm weird, but I loved it.

Replacing the floor boards in hall bath.
Drum roll, please....our bathrooms....from our side yard!


This was day one! An eventful day, MUCH more work to be done. Check back tomorrow for day 2.

Day One

Day one consisted of full demo of hall bathroom and beginning reconstruction. There was a large window in both bathroom stalls which caused SEVERE mold and water damage due to improper seals. We had to replace the entire wall in the hall bath and just remove all tile and drywall in the master.



My dad, John and my father in law, Mike hard at work.







My mom and mother in law, Cathy spent the day taking off popcorn ceilings (which we finished), laid carpet tiles (thanks Eames family) in the office/craft room, acted as go-fors, clean, and much more :)


John also took out the master vanity area near the closet and took out the wall, this way we will have a much larger closet area.
Photos off above progress coming in today's (day 2's post)